CASE STUDIES


                Complete      system    in    Project title           Intelligent Streetlighting
                   place along with street     City and country        Hyderabad, India
                   lamps and controls
                                               Client/ Concessioning   Greater Hyderabad Municipal
                Carries free replacement/     Authority               Corporation (GHMC)
                   maintenance over the        Contractor/ Concessionaire  Energy Efficiency Services Limited
                   time period of 12 years.                            (EESL)
                                                                       Retrofitting of 4,13,029 Existing
              Figure 1 shows that the break    Project Objective       Streetlights with Smart Street Lighting
              even  will  be  achieved  early                          System
              with the financial cost savings                          Installation of Energy Efficient
              from retrofitting exceeding the   Project Description    dimmable LED Street lights along with
              replacement and maintenance                              per feeder basis SCADA system.
              cost of the project.                                     Design, Build, Operate, Maintain &
                                               Type of PPP Contract    Transfer (DBOMT)
              Hyderabad (GHMC) Case
                                               Project Duration        7 Years
              Greater Hyderabad Municipal                              4,65,043 Number of LEDs to be
              Corporation (GHMC) has           Key Project Outcomes    Installed in place of existing streetlights
              undertaken     an   initiative   Project Begin Year      July 06, 2017.
              towards achieving energy
              efficiency  through PPP for      Capital cost/initial    ₹ 271.40 Cr
                                               investment
              the city streetlight system
              currently operated by it. The    Project Status          Ongoing energy performance contract
              GHMC entered into a service
              contract under PPP with M/s     This project is first of its    project involved replacing the
              Energy  Efficiency  Services    kind taken up by the GHMC       old High Pressure Sodium
                                                                                                   lighting
                                                                                        (HPSV)
                                                                              Vapour
                                              under PPP mode, wherein
              Limited (EESL) to replace
              the  traditional  streetlights   the  necessary  luminescence   fixtures, Fluorescent Tube
              (incandescent/    fluorescent   is to be maintained with        lighting   fixtures,   Metal
              bulbs) with modern  LEDs.       no    additional     financial  Halide lighting fixtures with
                                              investments by GHMC. The        new LED lighting  fixtures.
                                                                              The project is fully self-
                                                                              financed through the energy
                                                                              consumption savings and
                                                                              reductions in maintenance
                                                                              costs  brought  about  by  LED
                                                                              technology.
                                                                              3.2.1  Project snapshot
                                                                              Following  is  a  snapshot  of
                                                                              energy  conservation  through
                                                                              streetlight retrofitting project
                                                                              in Hyderabad.

                                                                              Table 3 shows the current
                                                                              streetlight  system in terms
                                                                              of Wattage of power in
              Figure 1: Break even achievement of streetlight retrofitting project  Hyderabad.